Projects

All Our Projects

COMPLETION of 2 Nos of 5 Bedrooms Block

Status: COMPLETED

April 26, 2015

Construction of 2Nos of 5 Rooms Block at Seme Control Post, Lagos State.

Construction of a Block of 30X One-Bedroom

Status : On-Going

Januaray, 2017

Construction of a Block of 30X One-Bedroom Airmen Studio Transit Accoundation at 107, Air Maritime Group Nigeria Air Force Benin
Owner: Nigeria Air-Force

Installation of solar street light

Status: On-going

March 2017

Installation of Solar Power Street Light, Along Patrick Yakowa Road, Kaduna State.

Drainage Construction

Status : Completed

April 26, 2015

Construction of Primary Health Care Centre including Generator House and Wall Fence at Papa Epe Lagos..

Development of WOODGREEN ESTATE/h4>

Status : Completed

June, 2014

Development of WOODGREEN ESTATE Phase 1
Owner: LORDWIN Gate Nigeria Ltd..

Forcing

Design / Artwork

April 26, 2015

Nulla varius consequat magna, id molestie ipsum volutpat quis. Suspendisse consectetur fringilla luctus. Fusce id mi diam, non ornare orci.

5 Fully Detached 4 Bedroom House

Status: Completed

November, 2014

Development of RoyalGreen Villa. Ilasan Lekki Lagos (5 fully detached four bedroom house).
Client : LORDWIN Gate Nigeria Ltd.

Kameleon

Design / Artwork

April 26, 2015

Nulla varius consequat magna, id molestie ipsum volutpat quis. Suspendisse consectetur fringilla luctus. Fusce id mi diam, non ornare orci.


welcome to nigeria